Darfield Road

Share this project

  • About The Project
  • Other Job Details

New build, end of terrace, 3-bed house. In-situ concrete frame. Brick and precast exterior. Architect designed. Approx 100 sqm GIA ovber three floors

The overarching architectural  principle for the house is an honest construction with a palette of exposed, self-finished materials.

These include, fair-faced in-situ concrete, exposed brick and blockwork, polished plaster, mild steel and lime-washed timber.

4 Packages Awarded

13 Packages To Be Procured

270 Days since published

8 People are Watching

Packages To Be Procured

Appliances

  • Service Required

    Supply Only

  • Tender Return

    31-Aug-2018

  • Start On Site

    29-Oct-2018

  • Project Size

    TBA

Below Ground Drainage

win badge
  • Service Required

    Supply and Install

  • Tender Return

    13-July-2018

  • Start On Site

    30-July-2018

  • Project Size

    TBA

Brick Work / Block Work

  • Service Required

    Supply and Install

  • Tender Return

    03-Aug-2018

  • Start On Site

    03-Sep-2018

  • Project Size

    TBA

Carpentry - First Fix

  • Service Required

    Supply and Install

  • Tender Return

    03-Aug-2018

  • Start On Site

    03-Sep-2018

  • Project Size

    TBA

Composite Windows

  • Service Required

    Supply and Install

  • Tender Return

    03-Aug-2018

  • Start On Site

    03-Sep-2018

  • Project Size

    TBA

Disposal / Waste Removal

  • Service Required

    Hire

  • Tender Return

    03-Aug-2018

  • Start On Site

    27-Aug-2018

  • Project Size

    TBA

Electrical Contractor

  • Service Required

    Design, Supply and Install

  • Tender Return

    03-Aug-2018

  • Start On Site

    01-Oct-2018

  • Project Size

    TBA

Ground Work

win badge
  • Service Required

    Supply and Install

  • Tender Return

    13-July-2018

  • Start On Site

    30-July-2018

  • Project Size

    TBA

Insitu Concrete

win badge
  • Service Required

    Supply and Install

  • Tender Return

    13-July-2018

  • Start On Site

    30-July-2018

  • Project Size

    TBA

Joinery

  • Service Required

    Supply and Install

  • Tender Return

    03-Aug-2018

  • Start On Site

    01-Oct-2018

  • Project Size

    TBA

Plumbing and Heating

  • Service Required

    Supply and Install

  • Tender Return

    31-Aug-2018

  • Start On Site

    31-Oct-2018

  • Project Size

    TBA

Polished Concrete Flooring

  • Service Required

    Supply and Install

  • Tender Return

    27-July-2018

  • Start On Site

    03-Sep-2018

  • Project Size

    TBA

Setting Out / Site Survey

  • Service Required

    Consultant

  • Tender Return

    10-Aug-2018

  • Start On Site

    20-Aug-2018

  • Project Size

    TBA

Slate / Tile Roofing

  • Service Required

    Supply and Install

  • Tender Return

    31-Aug-2018

  • Start On Site

    24-Sep-2018

  • Project Size

    TBA

Structural Steelwork

win badge
  • Service Required

    Design, Supply and Install

  • Tender Return

    27-July-2018

  • Start On Site

    03-Sep-2018

  • Project Size

    TBA

Timber Frames

  • Service Required

    Supply and Install

  • Tender Return

    27-July-2018

  • Start On Site

    24-Sep-2018

  • Project Size

    TBA

Wet Underfloor Heating

  • Service Required

    Supply and Install

  • Tender Return

    27-July-2018

  • Start On Site

    27-Aug-2018

  • Project Size

    TBA